Handover & Close Out

Handover & Close Out (or Commissioning/Defects Liability/Project Control) Phase involves the completion of the contract and the validation of the project quality and scope.

The Handover & Close Out Phase is likely to include the following tasks:

  • Defects / Snag List
  • Settlement of the final account
  • Monitoring of the commissioning of plant and equipment
  • Collection of as-built drawings and operation manuals
  • Collection of all verification documentation, quality checklists, proprietary design certification, and construction producer statements.
  • Collection and verification of the warranties
  • Periodical inspections of the on-going maintenance activities
  • Final inspection and signing

Building Consultancy

Contact us

Our experts at ESA engineering can supervise a building’s design through all its subsequent steps. Building Consultancy provides all design processes, from the preliminary settings to the translation of the design concept into the actual accomplishment of the building.

Our engineers help to define and coordinate all the components featured in the design, providing all the specifications and making them work together.